Reporting to the MRO Planning Committee (PC), the Transmission Assessment Subcommittee (TAS) shall conduct adequacy and security analysis of the MRO bulk electric transmission system to assess conformance of the system performance to the NERC and MRO standards, develop or evaluate new methodologies to enhance the steady-state and stability evaluation processes, and Conduct studies and perform other duties as required by the PC.
|