News Meetings Careers Contact Us

Table 6.2 - MRO Guidelines Supporting NERC Standards

Print this Page

Disclaimer: All MAPP and MAIN procedures and guides have been retired by the MRO Board (June 19th, 2008) and replaced by MRO Regional Standards and Guidelines.

MRO Guidelines and Procedures are monitored but are not enforceable until Regulatory approval.

Development of MRO guidelines and procedures are the responsibility of the subcommittees and working groups under the Reliability Assessment Committee unless otherwise noted in the table. Responsible Group Acronyms are defined below:

GTRTF: Generator Testing Review Task Force
PRS: Protection Relay Subcommittee
TAS: Transmission Assessment Subcommittee
RAS: Reliability Assessment Subcommittee
MBS: Model Building Subcommittee

To view NERC Standards go to http://www.nerc.com/page.php?cid=2/20.

Per the NERC Numbering Convention, interpretations end with a letter (i.e. BAL-003-0a).

Standards containing Approved Errata end with a decimal number (i.e. BAL-003-0.1b).

Resource and Demand Balancing (BAL)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC
BAL-001-0.1a Real Power Balancing Control Performance Yes Yes No additional documentation provided by MRO  

BAL-002-0

Disturbance Control Performance

Yes

Yes

See Section 4.5 – MRO Standards: MBAL-002-0

 

BAL-003-0.1b

Frequency Response and Bias

Yes Yes No additional documentation provided by MRO RAS

BAL-004-0

Time Error Correction

Yes Yes No additional documentation provided by MRO RAS

BAL-004-1

Time Error Correction

Yes   No additional documentation provided by MRO RAS
BAL-005-0.1b Automatic Generation Control Yes Yes No additional documentation provided by MRO RAS

BAL-006-1

Inadvertent Interchange

Yes Yes No additional documentation provided by MRO RAS

BAL-006-1.1

Inadvertent Interchange

Yes Yes No additional documentation provided by MRO RAS
Communications (COM)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC

COM-001-1.1

Telecommunications Yes Yes No additional documentation provided by MRO  
COM-002-2 Communications and Coordination Yes Yes No additional documentation provided by MRO  
Critical Infrastructure Protection (CIP)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC

CIP-001-1a

Sabotage Reporting

Yes Yes No additional documentation provided by MRO CIP Team
CIP-002-3 Critical Cyber Asset Identification

Yes Yes The Midwest Reliability Organization does not own any assets listed in CIP-002 R1.2 and therefore does not require a Risk-Based Assessment Methodology but will be in compliance with CIP-001 and CIP-003 through CIP-009 as required by FERC in Order 706. CIP Team
CIP-003-3 Security Management Controls Yes Yes CIP Team
CIP-004-3 Personnel & Training

Yes Yes CIP Team
CIP-005-3a Electronic Security Perimeter(s) Yes Yes CIP Team
CIP-006-3c Physical Security of Critical Cyber Assets Yes Yes CIP Team
CIP-007-3 Systems Security Management Yes Yes CIP Team
CIP-008-3 Incident Reporting and Response Planning Yes Yes CIP Team
CIP-009-3 Recovery Plans for Critical Cyber Assets Yes Yes CIP Team
Emergency Preparedness and Operations (EOP)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC
EOP-001-0 Emergency Operations Planning Yes Yes No additional documentation provided by MRO TAS
EOP-001-1 Emergency Operations Planning Yes   No additional documentation provided by MRO TAS

EOP-001-2

Emergency Operations Planning

Yes

 

No additional documentation provided by MRO

TAS

EOP-002-2.1 Capacity and Energy Emergencies Yes Yes

See NERC Energy Emergency Alerts
(Open EOP-002 and scroll to Attachment 1)

 

EOP-002-3

Capacity and Energy Emergencies

Yes

 

See Appendix 10 – NERC Energy Emergency Alerts

 

EOP-003-1 Load Shedding Plans Yes Yes No additional documentation provided by MRO TAS
EOP-004-1 Disturbance Reporting Yes Yes

See Appendix 1:C –Disturbance Monitoring and Reporting Requirements

See Appendix 7 – NERC Disturbance Report Form
PRS, TAS
EOP-005-1 System Restoration Plans Yes Yes No additional documentation provided by MRO PRS,TAS

EOP-005-2

System Restoration Plans

Yes

 

No additional documentation provided by MRO

PRS, TAS

EOP-006-1 Reliability Coordination – System Restoration Yes Yes No additional documentation provided by MRO  

EOP-006-2

System Restoration Coordination

Yes

 

No additional documentation provided by MRO

 

EOP-007-0

Establish, Maintain, and Document a Regional Blackstart Capability Plan

Yes  

MRO to continue to maintain BCP spreadsheet, which includes the blackstart test information.
Required data to be submitted to MRO shall include:

  • COMPANY
  • Unit Name
  • Location
  • MW Capacity
  • Type of Unit
  • Last Test Date
  • Starting Method
  • Type of test required
  • Testing Frequency
  • Minimum Duration
  • Met Black Start Plan Requirements
MRO to continue to collect generator testing information as identified in EOP-009.

MRO to continue to be prepared to submit BCP to NERC if requested.

GTRTF, TAS

EOP-008-0

Plans for Loss of Control Center Functionality

Yes Yes No additional documentation provided by MRO TAS

EOP-009-0

Documentation of Blackstart Generating Unit Test Results Yes Yes No additional documentation provided by MRO GTRTF
Facilities Design, Connections, and Maintenance (FAC)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC

FAC-001-0

Facility Connection Requirements

Yes Yes No additional documentation provided by MRO TAS

FAC-002-0

Coordination of Plans for New Facilities

Yes Yes No additional documentation provided by MRO TAS

FAC-002-1

Coordination of Plans for New Facilities

Yes

 

No additional documentation provided by MRO

TAS

FAC-003-1

Vegetation Management Program

Yes Yes

See Appendix 12 – Vegetation Outage Guideline and Reporting Form

 

FAC-008-1

Facility Ratings Methodology

Yes Yes

No additional documentation provided by MRO

TAS

FAC-009-1

Establish and Communicate Facility Ratings

Yes Yes

No additional documentation provided by MRO

TAS

FAC-010-2.1

System Operating Limits Methodology for the Planning Horizon

Yes Yes

No additional documentation provided by MRO

 

FAC-011-2

System Operating Limits Methodology for the Planning Horizon

Yes Yes No additional documentation provided by MRO  

FAC-012-1

Transfer Capabilities Methodology

Yes

 

No additional documentation provided by MRO

 

FAC-013-1

Establish and Communicate Transfer Capabilities

Yes

Yes

No additional documentation provided by MRO

TAS

FAC-014-2

Establish and Communicate System Operating Limits

Yes

Yes

No additional documentation provided by MRO

Interchange Scheduling and Coordination (INT)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC

INT-001-3

Interchange Information

Yes

Yes

No additional documentation provided by MRO

 

INT-003-2

Interchange Transaction Implementation

Yes

Yes

No additional documentation provided by MRO

 

INT-004-2

Dynamic Interchange Transaction Modifications

Yes

Yes

No additional documentation provided by MRO

 

INT-005-3

Interchange Authority Distributes Arranged Interchange

Yes

Yes

No additional documentation provided by MRO

 

INT-006-3

Response to Interchange Authority

Yes

Yes

No additional documentation provided by MRO

 

INT-007-1

Interchange Confirmation

Yes

Yes

No additional documentation provided by MRO

 

INT-008-3

Interchange Authority Distributes Status

Yes

Yes

No additional documentation provided by MRO

 

INT-009-1

Implementation of Interchange

Yes

Yes

No additional documentation provided by MRO

 

INT-010-1

Interchange Coordination Exemptions

Yes

Yes

No additional documentation provided by MRO

 
Interconnection Reliability Operations and Coordination (IRO)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC

IRO-001-1.1

Reliability Coordination – Responsibilities and Authorities

Yes

 

See Appendix 10 –  MAPP Non-MISO Member Reliability Coordinator Declaration
See Appendix 11 – SaskPower Reliability Coordinator Declaration
See Appendix 15 – MRO Reliability Plan
(MISO & SaskPower Reliability Plan)

MISO-RC

IRO-002-1

Reliability Coordination – Facilities

Yes

Yes

No additional documentation provided by MRO

MISO-RC

IRO-002-2

Reliability Coordination – Facilities

Yes

 

No additional documentation provided by MRO

MISO-RC

IRO-003-2

Reliability Coordination – Wide-Area View

Yes

Yes

No additional documentation provided by MRO

MISO-RC

IRO-004-1

Reliability Coordination – Operations Planning

Yes

Yes

No additional documentation provided by MRO

MISO-RC

IRO-004-2

Reliability Coordination – Operations Planning

Yes

 

No additional documentation provided by MRO

MISO-RC

IRO-005-2

Reliability Coordination – Current-Day Operations

Yes

Yes

No additional documentation provided by MRO

MISO-RC

IRO-005-2a

Reliability Coordination – Current-Day  Operations

Yes

 

No additional documentation provided by MRO

MISO-RC

IRO-005-3

Reliability Coordination – Current-Day Operations

Yes

 

No additional documentation provided by MRO

MISO-RC

IRO-006-3

Reliability Coordination – Transmission Loading Relief

Yes

Yes

No additional documentation provided by MRO

MISO-RC

IRO-006-4.1

Reliability Coordination – Transmission  Loading Relief

Yes

Yes

No additional documentation provided by MRO

MISO-RC

IRO-008-1

Reliability Coordinator Operational Analyses and Real-time Assessments

Yes

 

No additional documentation provided by MRO

MISO-RC

IRO-009-1

Reliability Coordinator Actions to Operate Within IROLs

Yes

 

No additional documentation provided by MRO

MISO-RC

IRO-010-1

Reliability Coordinator Data Specification and Collection

Yes

 

No additional documentation provided by MRO

MISO-RC

IRO-010-1a

Reliability Coordinator Data Specification and Collection

Yes

 

No additional documentation provided by MRO

MISO-RC

IRO-014-1

Procedures to Support Coordination Between Reliability Coordinators

Yes

Yes

No additional documentation provided by MRO

MISO-RC

IRO-015-1

Notifications and Information Exchange Between Reliability Coordinators

Yes

Yes

No additional documentation provided by MRO

MISO-RC

IRO-016-1

Coordination of Real-time Activities Between Reliability Coordinators

Yes

Yes

No additional documentation provided by MRO

MISO-RC

Modeling, Data, and Analysis (MOD)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC
MOD-004-1 Capacity Benefit Margin Yes   No additional documentation provided by MRO TAS
MOD-006-0.1 Procedures for Use of Capacity Benefit Margin Values Yes Yes No additional documentation provided by MRO TAS
MOD-007-0 Documentation of the Use of Capacity Benefit Margin Values Yes Yes No additional documentation provided by MRO TAS
MOD-008-1 Transmission Reliability Margin Calculation Methodology Yes   No additional documentation provided by MRO TAS
MOD-010-0 Steady-State Data for Modeling and Simulation  of the Interconnected Transmission System Yes Yes See Appendix 5 – MRO Model Building Procedure Manual MBS
MOD-011-0 Maintenance and Distribution of Steady-State Data Requirements and Reporting Procedures Yes   See Appendix 5 – MRO Model Building Procedure Manual MBS
MOD-012-0 Dynamics Data for Transmission System  Modeling and Simulation Yes Yes See Appendix 5 – MRO Model Building Procedure Manual MBS
MOD-013-1 Maintenance and Distribution of Dynamics Data Requirements and Reporting Procedures Yes   See Appendix 5 – MRO Model Building Procedure Manual MBS
MOD-014-0 Development of Steady State System Models Yes   See Appendix 5 – MRO Model Building Procedure Manual MBS
MOD-015-0 Development of Dynamics System Models Yes   See Appendix 5 – MRO Model Building Procedure Manual MBS
MOD-015-0.1 Development of Dynamics System Models Yes   See Appendix 5 – MRO Model Building Procedure Manual MBS
MOD-016-1.1 Documentation of Data Reporting Requirements for Actual and Forecast Demands Yes Yes The MRO collects Demand data and controllable DSM data through the LTRA data request. RAS
MOD-017-0.1 Aggregated Actual and Forecast Demands and Net Energy for Load Yes Yes No additional documentation provided by MRO RAS
MOD-018-0 Treatment of Nonmember Demand Data and How Uncertainties are Addressed in the Forecast of Demand and Net Energy for Load Yes Yes No additional documentation provided by MRO RAS
MOD-019-0.1 Reporting of Interruptible Demands and Direct Control Load Management Data Yes Yes No additional documentation provided by MRO RAS
MOD-020-0 Providing Interruptible Demands and DCLM Data Yes Yes No additional documentation provided by MRO RAS
MOD-021-0 Accounting Methodology for Effects of Controllable DSM in Forecasts Yes Yes No additional documentation provided by MRO RAS
MOD-024-1 Verification of Generator Gross and Net Real Power Capability Yes   See Appendix 3 – Generator Testing Guidelines GTRTF
MOD-025-1 Verification of Generator Gross and Net Reactive Power Capability Yes   See Appendix 3 – Generator Testing Guidelines GTRTF
MOD-028-1 Area Interchange Methodology Yes   No additional documentation provided by MRO  
MOD-029-1 Rated System Path Methodology Yes   No additional documentation provided by MRO  
MOD-030-1 Flowgate Methodology Yes   No additional documentation provided by MRO  

MOD-030-2

Flowgate Methodology

Yes   No additional documentation provided by MRO  
Nuclear (NUC)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC
NUC-001-1 Nuclear Plant Interface Coordination Yes Yes No additional documentation provided by MRO  
Personnel Performance, Training, and Qualifications (PER)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC

PER-001-0.1

Operating Personnel Responsibility and  Authority

Yes Yes

No additional documentation provided by MRO

 

PER-002-0

Operating Personnel Training

Yes Yes No additional documentation provided by MRO  

PER-003-0

Operating Personnel Credentials

Yes Yes No additional documentation provided by MRO  

PER-004-1

Reliability Coordination – Staffing

Yes Yes No additional documentation provided by MRO  

PER-004-2

Reliability Coordination – Staffing

Yes   No additional documentation provided by MRO  

PER-005-1

System Personnel Training

Yes   No additional documentation provided by MRO  
Protection and Control (PRC)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC

PRC-001-1

System Protection Coordination

Yes

Yes

No additional documentation provided by MRO

PRS

PRC-002-1

Analysis and Reporting of Transmission Protection System Misoperations

Yes

See Appendix 1:C – Disturbance Monitoring and Reporting Requirements

PRS

NERC is drafting PRC-002-2, to follow its progress, go to the NERC website.

PRC-003-1

Regional Requirements for Transmission and Generation Protection System Misoperations

Yes

See Appendix 1:A - Procedure for Analysis of Misoperations of Transmission and Generation Protection Systems

PRS

PRC-004-1

Analysis and Mitigation of Transmission and Generation Protection System Misoperations

Yes

Yes

See Appendix 1:A - Procedure for Analysis of Misoperations of Transmission and Generation Protection Systems

PRS

PRC-004-2

Analysis and Mitigation of Transmission and Generation Protection System Misoperations

Yes

See Appendix 1:A - Procedure for Analysis of Misoperations of Transmission and Generation Protection Systems

PRS

PRC-005-1

Transmission and Generation Protection System Maintenance and Testing

Yes

Yes

No additional documentation provided by MRO

PRS

PRC-006-0

Development and Documentation of Regional UFLS Programs

Yes

See Appendix 2 – MRO Underfrequency Load Shedding Program
See Appendix 2.A – MRO Coordinated Underfrequency Load Shedding Report

PRC-007-0

Assuring Consistency with Regional UFLS Programs

Yes

Yes

See Appendix 2 – MRO Coordinated Underfrequency Load Shedding Program

PRC-008-0

Underfrequency Load Shedding Equipment Maintenance Programs

Yes

Yes

See Appendix 2 – MRO Coordinated Underfrequency Load Shedding Program

PRC-009-0

UFLS Performance Following an Underfrequency Event

Yes

Yes

See Appendix 2 – MRO Coordinated Underfrequency Load Shedding Program

PRC-010-0

Assessment of the Design and Effectiveness of UVLS Program

Yes

Yes

No additional documentation provided by MRO

PRS, TAS

PRC-011-0

UVLS System Maintenance and Testing

Yes

Yes

No additional documentation provided by MRO

PRS

PRC-012-0

Special Protection System Review Procedure

Yes

See Appendix 1:B - Special Protection System Review

PRS, TAS

PRC-013-0

Special Protection System Database

Yes

The MRO maintains a confidential Special Protection System database.

PRS

PRC-014-0

Special Protection System Assessment

Yes

See Appendix 1:D - Special Protection System Assessment

PRS, TAS

PRC-015-0

Special Protection System Data and Documentation

Yes

Yes

No additional documentation provided by MRO

PRS, TAS

PRC-016-0.1

Special Protection System Misoperations

Yes

Yes

See Appendix 1:A - Procedure for Analysis of Misoperations of Transmission and Generation Protection Systems
See Appendix 1:B – Special Protection System Review

PRS

PRC-017-0

Special Protection System Maintenance and Testing

Yes

Yes

See Appendix 1:B - Special Protection System Review

PRS

PRC-018-1

Disturbance Monitoring Equipment Installation and Data Reporting

Yes

Yes

See Appendix 1:C – Disturbance Monitoring and Reporting Requirements

PRS

PRC-020-1

Under-Voltage Load Shedding Program  Database

Yes

 

 

UVLS Program is not applicable to the MRO Region

PRS

PRC-021-1

Under-Voltage Load Shedding Program Data

Yes

Yes

UVLS Program is not applicable to the MRO Region

PRS

PRC-022-1

Under-Voltage Load Shedding Program Performance

Yes

Yes

UVLS Program is not applicable to the MRO Region

PRS, TAS

PRC-023-1

Transmission Relay Loadability

Yes

Yes

No additional documentation provided by MRO

Transmission Operations (TOP)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC

TOP-001-1

Reliability Responsibilities and Authorities

Yes

Yes

No additional documentation provided by MRO

TAS

TOP-002-2

Normal Operations Planning

Yes

Yes

No additional documentation provided by MRO

TOP-002-2a

Normal Operations Planning

Yes

Yes

No additional documentation provided by MRO

TOP-003-0

Planned Outage Coordination

Yes

Yes

No additional documentation provided by MRO

TOP-003-1

Planned Outage Coordination

Yes

No additional documentation provided by MRO

TOP-004-2

Transmission Operations

Yes

Yes

No additional documentation provided by MRO

TOP-005-1.1a

Operational Reliability Information

Yes

Yes

No additional documentation provided by MRO

TOP-005-2

Operational Reliability Information

Yes

No additional documentation provided by MRO

TOP-006-1

Monitoring System Conditions

Yes

Yes

No additional documentation provided by MRO

TOP-006-2

Monitoring System Conditions

Yes

No additional documentation provided by MRO

TOP-007-0

Reporting SOL and IROL Violations

Yes

Yes

No additional documentation provided by MRO

TOP-008-1

Response to Transmission Limit Violations

Yes

Yes

No additional documentation provided by MRO

Transmission Planning (TPL)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC

TPL-001-0.1

System Performance Under Normal Conditions

Yes

Yes

See Section 4.5 – MRO Standards: TPL-504-MRO-01
See Section 4.5 – MRO Standards: TPL-503-MRO-01See Section 4.5 – MRO Standards: PRC-502-MRO-01

TPL-002-0a

System Performance Following Loss of a Single BES Element

Yes

Yes

See Section 4.5 – MRO Standards: TPL-504-MRO-01
See Section 4.5 – MRO Standards: TPL-503-MRO-01See Section 4.5 – MRO Standards: PRC-502-MRO-01

TPL-002-0b

System Performance Following Loss of a Single BES Element

Yes

See Section 4.5 – MRO Standards: TPL-504-MRO-01
See Section 4.5 – MRO Standards: TPL-503-MRO-01
See Section 4.5 – MRO Standards: PRC-502-MRO-01

TPL-003-0a

System Performance Following Loss of Two or More BES Elements

Yes

Yes

See Section 4.5 – MRO Standards: TPL-504-MRO-01
See Section 4.5 – MRO Standards: TPL-503-MRO-01 See Section 4.5 – MRO Standards: PRC-502-MRO-01

TPL-004-0

System Performance Following Extreme BES Events

Yes

Yes

See Section 4.5 – MRO Standards: TPL-504-MRO-01
See Section 4.5 – MRO Standards: TPL-503-MRO-01 See Section 4.5 – MRO Standards: PRC-502-MRO-01

TPL-005-0

Regional and Interregional Self- Assessment Reliability Reports

Yes

See Appendix 4 - MRO LTRA Data Request

TAS

TPL-006-0

Assessment Data from Regional Reliability Organizations

Yes

See Appendix 4 - MRO LTRA Data Request

TAS

TPL-006-0.1

Assessment Data from Regional Reliability Organizations

Yes

See Appendix 4 – MRO LTRA Data Request

TAS

Voltage and Reactive (VAR)
NERC Standard Title Approved By MRO Guideline Committee Responsible
NERC FERC
VAR-001-1 Voltage and Reactive Control Yes Yes No additional documentation provided by MRO  

VAR-001-2

Voltage and Reactive Control

Yes

No additional documentation provided by MRO

VAR-002-1 Generator Operation for Maintaining Network Voltage Schedules Yes Yes No additional documentation provided by MRO  
VAR-002-1.1a Generator Operation for Maintaining Network Voltage Schedules Yes Yes No additional documentation provided by MRO  

VAR-002-1.1b

Generator Operation for Maintaining Network Voltage Schedules

Yes

No additional documentation provided by MRO

Webpage last updated September 30, 2010
The Midwest Reliability Organization | 380 St. Peter Street, Suite 800, Saint Paul, MN 55102 | Phone: 651-855-1760 | Fax: 651-855-1712
Home